Results: 582
January
Manager German Cable Makers' Association
Tel.:
+49 221 96228-18
Email:
esther.hild@zvei.org
25.04.2023
The implementation of short transition periods for legislative proposals in connection with mandatory third-party certification is causing major problems for German and European manufacturers. T
05.05.2015
The brochure „Energy Efficiency with Electric Drive Systems“ shows the energy-saving potential of electric drive systems and presents the standards and regulations on the national and interantional m
14.03.2017
This is how the LCE-tool works: After basic information such as purchase, energy and operating costs have been entered, the Excel-based tool compares the project alternatives based on their present v
25.03.2019
The goal of the DC-INDUSTRIE research project is to redesign the power supply ofindustrial plants via a smart, open DC grid and to digitalise the industrial powersupply architecture. This will
15.11.2017
Beyond the traditional EMS basic services – the three pillars of “development, production and after-sales service” – there are a number of processes running in the background – backstage services – t