Filter

Results: 582

Manager German Cable Makers' Association

Esther Hild

25.04.2023

Ensure adequate transition periods for a functioning EU Single Market (Position Paper)

The implementation of short transition periods for legislative proposals in connection with mandatory third-party certification is causing major problems for German and European manufacturers. T

05.05.2015

Energy Efficiency with Electric Drive Systems

The brochure „Energy Efficiency with Electric Drive Systems“ shows the energy-saving potential of electric drive systems and presents the standards and regulations on the national and interantional m

14.03.2017

Energy Efficiency pays off: Lifecycle Cost Evaluation (LCE)

This is how the LCE-tool works: After basic information such as purchase, energy and operating costs have been entered, the Excel-based tool compares the project alternatives based on their present v

 

25.03.2019

Energiewende meets Industrie 4.0

The goal of the DC-INDUSTRIE research project is to redesign the power supply ofindustrial plants via a smart, open DC grid and to digitalise the industrial powersupply architecture.  This will

15.11.2017

EMS: Services backstage – added Value Under the Radar

Beyond the traditional EMS basic services – the three pillars of “development, production and after-sales service” – there are a number of processes running in the background – backstage services – t

Search results 411 until 420 of 582